view PDF (543 KB) | TIMBERLINE CHURCH EXPANSION - MAJOR AMENDMENT | 1-97B | 2908 S. TIMBERLINE RD. | SUBMITTAL-MAJOR AMENDMENTS | ROUTING SHEET | BHA DESIGN - WHITNEY DUVALL | JOHN SAILER | TED SHEPARD | 4 | COMPLETED |
view PDF (514 KB) | SPRING CREEK CENTER PUD FINAL | 17 90D | SE COR OF E PROSPECT RD AND S TIMBERLINE RD | FINAL DEVELOPMENT PLAN | ROUTING SHEET | THE W W REYNOLDS COMPANIES BY CITYSCAPE URBAN DESIGN INC | THE W W REYNOLDS COMPANIES | MICHAEL LUDWIG | 4 | COMPLETED |
view PDF (182 KB) | UNIVERSITY CENTER PUD (UNIVERSITY MALL REDEVELOPMENT) - FINAL | 2-96A | 2211 S. COLLEGE AVE. | FINAL DEVELOPMENT PLAN | PROJECT SUBMITTAL AND RESUBMITTAL | ZTI GROUP ARCHITECTURE / ED ZDENEK | UNIVERSITY MALL VENTURE GROUP, INC. | STEVE OLT | 4 | COMPLETED |
view PDF (1.2 MB) | UNIVERSITY CENTER PUD (UNIVERSITY MALL REDEVELOPMENT) - FINAL | 2-96A | 2211 S. COLLEGE AVE. | FINAL DEVELOPMENT PLAN | ROUTING SHEET | ZTI GROUP ARCHITECTURE / ED ZDENEK | UNIVERSITY MALL VENTURE GROUP, INC. | STEVE OLT | 4 | COMPLETED |
view PDF (987 KB) | 637 COWAN STREET - PDP | 21-03 | 637 COWAN ST. | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | BARRY SCHRAM | BARRY SCHRAM | TROY JONES | 4 | COMPLETED |
view PDF (1.0 MB) | SPRING CREEK FARMS NORTH, FIRST FILING, FINAL PLAT - PDP | 24-00B | NW COR. OF S. TIMBERLINE RD. & E. DRAKE RD. | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | JIM ALLEN-MORLEY / STANTEC CONSULTING INC. | BROCK CHAPMAN, VICE-PRESIDENT / SC GROUP INVESTMENTS, LLC | STEVE OLT | 4 | COMPLETED |
view PDF (597 KB) | 210-212 W. MAGNOLIA ST., URBAN LIVING LOFTS - PDP | 24-05 | 210 & 212 W. MAGNOLIA ST. | FINAL DEVELOPMENT PLAN | ROUTING SHEET | URBAN LIVING CONCEPTS LLC | URBAN LIVING CONCEPTS LLC | ANNE ASPEN | 4 | COMPLETED |
view PDF (1.9 MB) | EVERGREEN PARK REPLAT (NO. 1), BLOCK 5, LOTS 1 & 2 - PDP/FDP | 24-96A | 1414 - 1420 BLUE SPRUCE DR. | FINAL DEVELOPMENT PLAN | DRAINAGE REPORT | SHEAR ENGINEERING CORPORATION | PREMIER CUSTOM BUILDERS, INC. | MICHAEL LUDWIG | 4 | COMPLETED |
view PDF (473 KB) | EVERGREEN PARK REPLAT (NO. 1), BLOCK 5, LOTS 1 & 2 - PDP/FDP | 24-96A | 1414 - 1420 BLUE SPRUCE DR. | FINAL DEVELOPMENT PLAN | ROUTING SHEET | SHEAR ENGINEERING CORPORATION | PREMIER CUSTOM BUILDERS, INC. | MICHAEL LUDWIG | 4 | COMPLETED |
view PDF (1.1 MB) | POUDRE RIVER BUSINESS PARK 2ND FILING PDP - FINAL PLAT REVIEW | 24-99 | 1100 POUDRE RIVER DR. | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | STEWART & ASSOCIATES | LHA PARTNERSHIP | RON FUCHS | 4 | COMPLETED |
view PDF (1.1 MB) | SPANJER OFFICE BUILDING - PDP | 25-01 | WEST SIDE OF S. COLLEGE AVE., NORTH OF CAMERON DR. (5131 S. COLLEGE AVE.) | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | LAND IMAGES, INC. | NICHOLANE PROPERTIES, LLC | STEVE OLT | 4 | COMPLETED |
view PDF (193 KB) | HARVEST PARK - PDP | 25-98A | WEST SIDE OF CO. RD. 9 (ZIEGLER RD.) BETWEEN E. HARMONY RD. & CO. RD. 36 (KECHTER RD.) | PROJECT-DEVELOPMENT PLAN | ALTERNATIVE COMPLIANCE REQUEST | THE WRITER CORPORATION - C/O VIGNETTE STUDIOS | RONN & PAULA RUFF | RON FUCHS | 4 | COMPLETED |
view PDF (277 KB) | HARVEST PARK - PDP | 25-98A | WEST SIDE OF CO. RD. 9 (ZIEGLER RD.) BETWEEN E. HARMONY RD. & CO. RD. 36 (KECHTER RD.) | PROJECT-DEVELOPMENT PLAN | LETTER OF INTENT | THE WRITER CORPORATION - C/O VIGNETTE STUDIOS | RONN & PAULA RUFF | RON FUCHS | 4 | COMPLETED |
view PDF (278 KB) | HARVEST PARK - PDP | 25-98A | WEST SIDE OF CO. RD. 9 (ZIEGLER RD.) BETWEEN E. HARMONY RD. & CO. RD. 36 (KECHTER RD.) | PROJECT-DEVELOPMENT PLAN | LETTER OF INTENT | THE WRITER CORPORATION - C/O VIGNETTE STUDIOS | RONN & PAULA RUFF | RON FUCHS | 4 | COMPLETED |
view PDF (1.2 MB) | HARVEST PARK - PDP | 25-98A | WEST SIDE OF CO. RD. 9 (ZIEGLER RD.) BETWEEN E. HARMONY RD. & CO. RD. 36 (KECHTER RD.) | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | THE WRITER CORPORATION - C/O VIGNETTE STUDIOS | RONN & PAULA RUFF | RON FUCHS | 4 | COMPLETED |
view PDF (761 KB) | SAGE CREEK - PDP | 25-98B | NW . COR. OF COUNTY ROAD 36 & COUNTY ROAD 9 | CORRESPONDENCE-APPLICANTS RESPONSE | ALTERNATIVE COMPLIANCE REQUEST | JAMES CONSTRUCTION COMPANY, INC. - C/O CITYSCAPE URBAN DESIGN, INC. | H.H. INVESTMENT COMPANY | RON FUCHS | 4 | COMPLETED |
view PDF (1.3 MB) | SAGE CREEK - PDP | 25-98B | NW . COR. OF COUNTY ROAD 36 & COUNTY ROAD 9 | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | JAMES CONSTRUCTION COMPANY, INC. - C/O CITYSCAPE URBAN DESIGN, INC. | H.H. INVESTMENT COMPANY | RON FUCHS | 4 | COMPLETED |
view PDF (792 KB) | PEAK VIEW SUBDIVISION - PDP (RE-SUBMITTAL) | 26-00 | SOUTH SIDE OF W. ELIZABETH ST. BETWEEN SIENNA P.U.D. & LORY ANN ESTATES DEVELOPMENTS | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | DESIGN DEVELOPMENT CONSULTANTS | BLS DEVELOPMENT, LLC / VICKI WAGNER | TED SHEPARD | 4 | COMPLETED |
view PDF (506 KB) | REDTAIL RESIDENTIAL - FDP | 26-01A | WEST SIDE OF S. COLLEGE AVE., WEST END OF CAMERON DR. | FINAL DEVELOPMENT PLAN | ROUTING SHEET | LAGUNITAS REDTAIL, INC. | LAGUNITAS REDTAIL, INC. | TROY JONES | 4 | COMPLETED |
view PDF (561 KB) | REDTAIL RESIDENTIAL - FDP | 26-01A | WEST SIDE OF S. COLLEGE AVE., WEST END OF CAMERON DR. | FINAL DEVELOPMENT PLAN | ROUTING SHEET | LAGUNITAS REDTAIL, INC. | LAGUNITAS REDTAIL, INC. | TROY JONES | 4 | COMPLETED |
view PDF (1.2 MB) | DISCOUNT TIRE AT FOSSIL CREEK - PDP/FDP | 26-02 | SE COR. OF S. COLLEGE AVE. & FOSSIL CREEK PARKWAY | FINAL DEVELOPMENT PLAN | ROUTING SHEET | VF RIPLEY ASSOCIATES | DISCOUNT TIRE COMPANY | TROY JONES | 4 | COMPLETED |
view PDF (1.1 MB) | RIVERSIDE CENTRE (1450 RIVERSIDE) - PDP | 26-98 | 1400 - 1500 RIVERSIDE AVE. | SUBMITTAL-PDP | ROUTING SHEET | ARCHITECTURE ONE, P.C. / ALAN HAUSER | DON SKAGGS | TED SHEPARD | 4 | COMPLETED |
view PDF (487 KB) | RIVERSIDE CENTRE (MODIFICATION OF STANDARD) - PDP | 26-98 | 1400 - 1500 RIVERSIDE AVE. | SUBMITTAL-PDP | PLANNING OBJECTIVES | ARCHITECTURE ONE, P.C. / ALAN HAUSER | DON SKAGGS | TED SHEPARD | 4 | COMPLETED |
view PDF (1.1 MB) | GOOD SAMARITAN VILLAGE - PDP | 27-96B | 508 W. TRILBY RD. | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | LANDMARK ENGINEERING LTD. / KEN MERRITT | THE EVANGELICAL LUTHERAN GOOD SAMARITAN SOCIETY | TROY JONES | 4 | COMPLETED |
view PDF (223 KB) | LOFTS AT CAMPUS WEST (THE) - PDP/FDP | 28-97 | 816 CITY PARK AVE. | FINAL DEVELOPMENT PLAN | EASEMENTS | DANA LOCKWOOD / LOCKWOOD ARCHITECTS | CAMPUS PROPERTIES LLC | MICHAEL LUDWIG | 4 | COMPLETED |
view PDF (65 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | CORRESPONDENCE-APPLICANTS RESPONSE | CITY STAFF | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (44 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | CORRESPONDENCE-APPLICANTS RESPONSE | CITY STAFF | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (43 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | CORRESPONDENCE-APPLICANTS RESPONSE | CITY STAFF | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (7 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | CORRESPONDENCE-APPLICANTS RESPONSE | PHOTOMETRIC PLAN | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (28 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | CORRESPONDENCE-APPLICANTS RESPONSE | PRIVATE ENTITIES | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (33 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | CORRESPONDENCE-APPLICANTS RESPONSE | | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (28 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | CORRESPONDENCE-APPLICANTS RESPONSE | | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (742 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | PROJECT-DEVELOPMENT PLAN | ALTERNATIVE COMPLIANCE REQUEST | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (123 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | PROJECT-DEVELOPMENT PLAN | MODIFICATION REQUEST | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (655 KB) | OLD TOWN NORTH - 90% PDP | 28-99A | JUST NORTH OF E. VINE DR. BETWEEN N. COLLEGE AVE. & REDWOOD ST., SOUTH OF CONIFER ST. | SUBMITTAL-PDP | APPLICATION | BHA DESIGN / RUSSELL LEE | MONICA SWEERE / PALLADIAN CONSTRUCTION CO. | TROY JONES | 4 | COMPLETED |
view PDF (493 KB) | PARADIGM PROPERTIES - ODP | 29-01A | SE COR. OF E. PROSPECT RD. & I-25 | SUBMITTAL-ODP | DRAINAGE REPORT | HATTMAN ASSOCIATES | PARADIGM PROPERTIES | STEVE OLT | 4 | COMPLETED |
view PDF (1.3 MB) | PARADIGM PROPERTIES - ODP | 29-01A | SE COR. OF E. PROSPECT RD. & I-25 | SUBMITTAL-ODP | ROUTING SHEET | HATTMAN ASSOCIATES | PARADIGM PROPERTIES | STEVE OLT | 4 | COMPLETED |
view PDF (996 KB) | WESTBROOKE PUD SECOND FILING FINAL | 3 90H | EAST SIDE OF SENECA ST AND NORTH OF WAKEROBIN LN | FINAL DEVELOPMENT PLAN | ROUTING SHEET | JEFF COUCH OF TEAM ENGINEERING | P AND B PARTNERSHIP | STEVE OLT | 4 | COMPLETED |
view PDF (635 KB) | SANCTUARY WEST - PDP | 30-07 | 2200 - 2400 BLOCK, NORTH SIDE OF LAPORTE AVE. | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | VIGNETTE STUDIOS | SOLITAIRE HOMES, LLC | STEVE OLT | 4 | COMPLETED |
view PDF (802 KB) | HEARTHFIRE (HOFFMAN) PUD - PRELIMINARY (REVISED) | 31-95A | SE COR. OF DOUGLAS RD. & CO. RD. 13 | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | JIM SELL DESIGN, INC. | RICHARDS LAKE DEVELOPMENT CO. / COLORADO GENERAL PARTNERSHIP | STEVE OLT | 4 | COMPLETED |
view PDF (1.4 MB) | HEARTHFIRE PUD, 2ND FILING - FINAL | 31-95E | SE COR. OF E. DOUGLAS RD. & CO. RD. 13, NORTH OF RICHARD'S LAKE | FINAL DEVELOPMENT PLAN | ROUTING SHEET | PINECREST PLANNING & DESIGN - TOM DUGAN | RICHARD'S LAKE DEVELOPMENT COMPANY | STEVE OLT | 4 | COMPLETED |
view PDF (1.4 MB) | REGISTRY RIDGE PUD, 3RD FILING - FINAL | 32-95E | WEST SIDE OF S. SHIELDS ST. & SOUTH OF W. TRILBY RD. | FINAL DEVELOPMENT PLAN | ROUTING SHEET | VF RIPLEY ASSOCIATES | DALCO LAND, LLC - C/O COLORADO LAND SOURCE | STEVE OLT | 4 | COMPLETED |
view PDF (96 KB) | REGISTRY RIDGE PUD, SECOND FILING - PRELIMINARY / FINAL | 32-95F | WEST SIDE OF S. SHIELDS ST., BOUNDED BY TRUXTUN DR. (NORTH), NIMITZ DR. (WEST) & BON HOMME RICHARD DR. (SOUTH) | FINAL DEVELOPMENT PLAN | LEGAL DOCUMENTS | VF RIPLEY ASSOCIATES / LOUISE HERBERT | DALCO LAND, L.L.C. | STEVE OLT | | COMPLETED |
view PDF (1.3 MB) | REGISTRY RIDGE PUD, SECOND FILING - PRELIMINARY / FINAL | 32-95F | WEST SIDE OF S. SHIELDS ST., BOUNDED BY TRUXTUN DR. (NORTH), NIMITZ DR. (WEST) & BON HOMME RICHARD DR. (SOUTH) | FINAL DEVELOPMENT PLAN | ROUTING SHEET | VF RIPLEY ASSOCIATES / LOUISE HERBERT | DALCO LAND, L.L.C. | STEVE OLT | 4 | COMPLETED |
view PDF (5.7 MB) | PROMONTORY - PDP | 32-99 | NW COR. OF BOARDWALK DR. & TROUTMAN PARKWAY | CORRESPONDENCE-APPLICANTS RESPONSE | REVISIONS | LAGUNITAS PARK PLACE, INC. / JON PROUTY | THE CITY OF FORT COLLINS, A MUNICIPAL CORPORATION | STEVE OLT | 4 | COMPLETED |
view PDF (42 KB) | PROMONTORY - PDP | 32-99 | NW COR. OF BOARDWALK DR. & TROUTMAN PARKWAY | CORRESPONDENCE-APPLICANTS RESPONSE | REVISIONS | LAGUNITAS PARK PLACE, INC. / JON PROUTY | THE CITY OF FORT COLLINS, A MUNICIPAL CORPORATION | STEVE OLT | 4 | COMPLETED |
view PDF (217 KB) | PROMONTORY - PDP | 32-99 | NW COR. OF BOARDWALK DR. & TROUTMAN PARKWAY | PROJECT-DEVELOPMENT PLAN | MODIFICATION REQUEST | LAGUNITAS PARK PLACE, INC. / JON PROUTY | THE CITY OF FORT COLLINS, A MUNICIPAL CORPORATION | STEVE OLT | 4 | COMPLETED |
view PDF (1.3 MB) | PROMONTORY - PDP | 32-99 | NW COR. OF BOARDWALK DR. & TROUTMAN PARKWAY | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | LAGUNITAS PARK PLACE, INC. / JON PROUTY | THE CITY OF FORT COLLINS, A MUNICIPAL CORPORATION | STEVE OLT | 4 | COMPLETED |
view PDF (17 KB) | CENTERPOINT PLAZA - PDP | 35-01 | SE COR. OF S. TIMBERLINE RD. & MIDPOINT DR. | CORRESPONDENCE-STAFF REVIEW COMMENTS | ACCESS, UTILITY, DRAINAGE EASEMENT | VF RIPLEY ASSOCIATES | CO-FLEX INVESTMENTS, LLC | STEVE OLT | 4 | COMPLETED |
view PDF (1.6 MB) | CENTERPOINT PLAZA - PDP | 35-01 | SE COR. OF S. TIMBERLINE RD. & MIDPOINT DR. | PROJECT-DEVELOPMENT PLAN | ROUTING SHEET | VF RIPLEY ASSOCIATES | CO-FLEX INVESTMENTS, LLC | STEVE OLT | 4 | COMPLETED |